Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill, Havefordwest, South Wales. The wind turbine went live March 18th 2016 and was supplied by Enercon, E53 model derated to 500kW.
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill, Havefordwest, South Wales. The wind turbine went live March 18th 2016 and was supplied by Enercon, E53 model derated to 500kW.