Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Dredgeman Hill, Havefordwest, South Wales. The wind turbine went live September 28th 2016 and was supplied by Enercon, E53 model derated to 500kW.
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Dredgeman Hill, Havefordwest, South Wales. The wind turbine went live September 28th 2016 and was supplied by Enercon, E53 model derated to 500kW.