Dredgeman Energy 500kW Goes Live September 2016
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Dredgeman Hill, Havefordwest, South Wales. The wind turbine went live September 28th 2016 and was supplied by Enercon, E53 model derated to 500kW.
500kW Turbine Commissioned at Lawrence Landfill
Wind Energy Direct developed, installed and commissioned a 500kW wind turbine at Lawrence Landfill, Havefordwest, South Wales. The wind turbine went live March 18th 2016 and was supplied by Enercon, E53 model derated to 500kW.
2.3MW Auto-Production Wind Turbine for Charlestown
An Enercon E92 2.3MW wind turbine is planned for commissioning in Q4 2017 . Planning and Grid have been secured for an onsite wind turbine to supply electricity to a large local employer in Charlestown. Co. [...]